Process

We Build the Home of the Future — Today

Every system we design is specified for the people who will live in it — not just the construction documents. Our delivery model follows CEDIA recommended practices for residential integration, phase-matched to your construction schedule.

Aligned with CEDIA best practices — first fix through commissioning
1
Construction phase: Pre-construction

Discovery & Blueprint Review

We start where you start. Architectural plans are the source of truth — room counts, window schedules, load layouts — paired with a structured discovery of how the client will actually live in the home. No site visit required to begin.

2
Construction phase: Pre-construction

Design & Engineering

Room-by-room lighting zones, AV layout, control system design, shading schedule, network architecture. Every load identified, every device placed, every cable path engineered — before a wire is pulled.

3
Construction phase: Before groundbreak

Documentation, Submittals & Procurement

Fixture schedule, bill of materials, wiring schematics, Lutron/Crestron submittal drawings — everything your GC and electrician need, delivered before groundbreak. Equipment sourced direct through authorized manufacturer relationships, tied to the spec.

4
Construction phase: Framing

Pre-Wire — First Fix

Structured cabling roughed in during framing to CEDIA cabling guidelines — every run labeled, tested, and documented before insulation and drywall close the walls. Coordinated directly with your framing and electrical schedule.

5
Construction phase: Post-drywall

Trim-Out — Second Fix

Keypads, speakers, shades, cameras, and touch panels terminated and mounted after paint. Every device verified against the drawings — placement, termination, and function — before finish trades close in.

6
Construction phase: Finish

Rack Build, Programming & Commissioning

Head-end rack built and documented, scene setup, device enrollment, network segmentation, and a full system test against the original design. We don't leave until everything works the way it was designed.

7
Construction phase: Occupancy

Client Handoff, Portal Access & Service

End user walkthrough, system training, as-built documentation, and activation of the client portal. Ongoing system health monitoring and service support from day one of occupancy.

We design for the person living there — not just the person building it. Every scene, every keypad, every automation is considered from the end user's perspective before a single device ships.

Ready to spec your next project?